01

Urgent safety and inclusion

Renew the multipurpose sports hall

An end-of-life floor and severe acoustic problems are placing a heavily used school and community asset at risk.

Government ask: commit funding through the next available Department of Education or VSBA capital works pathway for floor replacement, associated safety works and acoustic treatment.

Why this is urgent

The existing timber floor has reached the end of its serviceable life. Professional advice confirms it can no longer be sanded or refinished because there is insufficient timber thickness. Surface deterioration has reduced traction, while protruding nails and emerging defects require continuing monitoring and maintenance.

Students have slipped during basketball and physical activities. Without renewal, further restrictions or partial closure may be needed, removing a critical indoor space during winter, wet weather and extreme heat.

Dailyschool use for PE, learning, assemblies, performances and OSHC
5 dayscommunity basketball use across four nights and Saturdays

More than a sports floor

The hall is one of the school's most flexible spaces. It supports physical education, music and drama, whole-school activities, performances and outside-school-hours care. It is also an important local basketball venue in a municipality with strong demand for indoor courts.

Excessive reverberation makes speech difficult to understand and creates a barrier for neurodiverse students and others with sensory sensitivities. Acoustic wall and ceiling treatment would make the hall safer, calmer and more inclusive for learning, performance and community events.

What the investment delivers

  • A durable, compliant indoor sports floor with appropriate line marking and safe thresholds.
  • Removal of slip, trip and protruding-nail risks that routine maintenance can no longer resolve.
  • Improved acoustic conditions for students, staff, families and community users.
  • Continuity for PE, OSHC, school events and Coburg Basketball Association programs.
  • A longer service life for an existing shared public asset.